Skip to main content

VisionONE

Skip to content

Manufacturing

ERP for manufacturing businesses in Kenya

Bring materials, purchasing and finance together around your manufacturing workflow. Review the product’s material list, production records and costing in a scoped VisionONE demo, with the functions your team needs demonstrated before rollout.

Materials & purchasing

Review material availability, supplier orders and accepted receipts. Keep units, locations and source costs consistent before production starts.

Bills of materials

Bring the product’s material list, quantities and revision to the demo. Confirm supported BOM structure, substitutions and approval requirements.

Production records

Review how material issues, completed quantities and outstanding work are recorded. Demonstrate the work-order scope your operation needs.

Costing & finance

Connect the material and conversion-cost review to inventory and finance. Agree the costing method, allocation basis and supported postings.

Batches & inventory

Keep material and finished-goods identifiers with stock movements. Review batch, serial or expiry requirements and the traceability your team needs.

Implementation & testing

Test one product from materials to completed stock. Include a shortage, a production correction and the reconciliation needed before rollout.

Manufacturing requirements reviewed with VisionONE ERP

Discuss your manufacturing workflow

On this page

Part of VisionONE ERP

Bills of materials and production records

From the material list
to completed stock and its cost.

Use one fictional 100-unit batch to review requirements, material issues, accepted completion and an outward stock movement. Each stage keeps the quantities and costs consistent.

Illustrative workflow · WO-DEMO-025

100 finished units · amounts in KES

Stage 1 of 4 · Plan

Start with the product, quantities and revision.

The fictional material list BOM-DEMO-025-A makes 100 units of PRODUCT-DEMO-A using 2 material units and 1 pack per finished unit. It requires 200 material units at KES 200 each and 100 packs at KES 30 each. The example has 400 material units and 200 packs available before issue.

Illustrative record

Planned output
100 finished units
Material requirement
200 units
Packaging requirement
100 packs
Material-list revision
BOM-DEMO-025-A

Stage 2 of 4 · Issue

Keep the issue with its source batch and cost.

Issue the required 200 material units, costing KES 40,000, and 100 packs, costing KES 3,000, against WO-DEMO-025. Total issued materials cost KES 43,000. The remaining stores hold 200 material units and 100 packs, also worth KES 43,000 under the example’s unchanged costs.

Illustrative record

Production reference
WO-DEMO-025
Material issue cost
KES 40,000
Packaging issue cost
KES 3,000
Total issued materials
KES 43,000

Stage 3 of 4 · Complete

Connect accepted output to the completed batch.

The illustration completes and accepts 100 finished units as BATCH-DEMO-025. Add KES 12,000 allocated labour and KES 5,000 allocated overhead to KES 43,000 materials. Total modelled batch cost is KES 60,000, or KES 600 per accepted unit. It assumes no reject, rework or remaining work in progress.

Illustrative record

Accepted output
100 units
Allocated conversion cost
KES 17,000
Modelled batch cost
KES 60,000
Cost per finished unit
KES 600

Stage 4 of 4 · Release

Read finished stock after the outward movement.

Issue 25 finished units against DN-DEMO-025 at the unchanged illustrative cost of KES 600 each. Issued cost is KES 15,000. The batch retains 75 finished units worth KES 45,000. Together with KES 43,000 remaining materials and packs, closing tracked inventory is KES 88,000.

Illustrative record

Finished units issued
25 units
Issued finished-goods cost
KES 15,000
Batch stock remaining
75 units
Closing tracked inventory
KES 88,000

This is an educational costing example for a requirements discussion, not a demonstrated VisionONE production screen. It assumes one completed batch, no rejects or remaining work in progress, fixed unit costs and an agreed fictional allocation. Tax and other charges are excluded.

Costing, batches and finance

One production batch.
Its cost, quantity and reconciliation.

When evaluating manufacturing ERP software in Kenya, ask to follow the same product through materials, accepted output and finance. These illustrative views explain the questions to test.

Illustrative views · one completed batch

Same materials, conversion costs and stock issue

Explain the cost of one accepted finished unit.

The example assigns KES 43,000 materials and packaging, KES 12,000 labour and KES 5,000 overhead to 100 accepted units. KES 60,000 divided by 100 gives KES 600 per unit. The allocation is an educational assumption, not a prescribed accounting policy.

Modelled unit cost
KES 600KES 60,000 divided by 100 accepted units
Illustrative batch cost build-upWO-DEMO-025 · amounts in KES
Cost component Amount
Material units200 × KES 200 40,000
Packaging100 × KES 30 3,000
Allocated labour 12,000
Allocated overhead 5,000
Total modelled cost 60,000

Review the actual costing method, cost absorption and treatment of rejected or incomplete output in your demo. The illustration has no scrap, rework or closing work in progress.

Follow the output and its remaining quantity.

BATCH-DEMO-025 completes 100 units and issues 25 under DN-DEMO-025. The remaining 75 units are worth KES 45,000 at KES 600 each. The example links its source material batch and packaging lot for discussion; demonstrate the traceability actually supported.

Finished stock remaining
75 units100 completed less 25 issued
Illustrative finished-batch movementsBATCH-DEMO-025 · finished units
Movement Units Value KES
Accepted completion 100 60,000
Outward issue −25 −15,000
Closing batch stock 75 45,000

Source references are MAT-BATCH-DEMO-A and PACK-LOT-DEMO-A. This is not a demonstrated genealogy report or a quality-management certificate. Confirm the available material-to-output links and permissions.

Reconcile materials, finished stock and issued cost.

Opening materials and packs total KES 86,000. The example adds KES 17,000 conversion cost and issues KES 15,000 of completed goods, leaving KES 88,000 tracked inventory. Review the actual production postings with finance using the agreed costing policy.

Closing tracked inventory
KES 88,000KES 43,000 materials + KES 45,000 finished stock
Illustrative inventory cost bridgeAmounts in KES · not a ledger export
Measure Amount
Opening materials and packs 86,000
Added conversion cost 17,000
Issued finished-goods cost −15,000
Closing tracked inventory 88,000

The bridge reconciles the illustration, not a posted journal. Confirm inventory, work-in-progress, absorption and expense accounts, along with supported completion and reversal behaviour.

Ask to see a current BOM, work-order and costing example. Confirm the production records, financial postings and traceability supported for your process.

Manufacturing workflows and product scope

Start with the product.
Demonstrate the production scope.

The public VisionONE industry description names bills of materials, work orders and batch costing. Use your actual product and production record to confirm how those requirements are handled in the proposed setup.

  • Bring the product structure, revision and unit-conversion requirements.
  • Test the actual issue, completion, correction and work-in-progress records.
  • Review the inventory and finance postings with an agreed costing policy.

Match the demo to the production method.

A simple assembly, a recipe-based process and a multi-stage factory can need different records. Confirm BOM levels, work-order limits, substitutions, yield and partial completion before agreeing the scope. Advanced MRP, MES and machine integration require separate evidence.

Request a production-scope demoProduct and material structure

Review the material-list revision, units and requirements the production record needs.

Production and stock movements

Demonstrate actual issues, accepted output, returns and batch links in the current product.

Cost and finance reconciliation

Agree the allocation policy and review the resulting inventory and financial records.

Agree what is standard, configured or integrated in writing. The illustrative batch is a discussion aid, not confirmation of every production function.

Gloved hand working with green glass bottles on a factory work surface
Keep material, production and finished-stock references connected

Materials and purchasing

Know what is available,
what is issued and what comes back.

Manufacturing stock needs more than a total quantity. Review the units, locations and source references behind the material requirement, then connect purchasing, accepted receipts and production issues.


  • Check availability in the correct unit

    Review the material quantity, selling or production unit, warehouse and batch. Compare the product requirement with available stock and incoming supplier orders.


  • Record the goods actually accepted

    Keep supplier order, receipt quantity and source cost together. Review damaged or short deliveries before making the materials available to production.


  • Keep returns and substitutions with the issue

    Identify material returned to stores and any approved replacement. Retain the production reference and review the cost effect rather than losing the original movement.

Batch, inventory and production checks

Test the details
that change output and cost.

Use the material list, actual quantities and source records to review a routine batch and the exceptions around it. Confirm the supported behaviour before live use.

Material-list revision and units

Agree the product revision, quantity basis and unit conversions. Demonstrate supported BOM levels, effective dates, substitutions and change approvals before using them.

Actual issues and returns

Compare the planned requirement with the actual issue and material returned. Keep any difference with the work reference and responsible reviewer.

Yield, scrap and rework

Record accepted output separately from rejects and unresolved work. Confirm supported yield, scrap, rework and partial-completion behaviour; the illustration assumes none.

Cost allocation and posting

Agree which labour and overhead costs enter the batch, and on what basis. Reconcile completed stock, issued cost and work in progress with finance.

Batch and serial references

Review identifiers on receipts, material issues, completions and outward movements. Demonstrate the traceability required for your products and any expiry rules.

Approval and correction history

Define who may release materials, confirm completion or adjust quantities and costs. Test a correction with its original source reference and approved history.

Connected manufacturing requirements

Materials, cost and finance
in the wider ERP review.

Use the inventory, finance and implementation pages for the detailed scope behind your manufacturing requirements.

Inventory & Warehousing

Review material and finished-goods locations, stock counts, identifiers and inventory valuation.

Explore inventory and warehousing

Finance & Accounting

Agree the cost review, inventory reconciliation and financial postings your manufacturing workflow requires.

Explore finance and accounting

ERP Implementation

Plan the scope, data migration, product demonstration, user testing and rollout around your actual production records.

Explore ERP implementation

Scope purchasing alongside production. Include supplier orders, accepted receipts and material-cost records in your demo. Discuss your purchasing requirements with the team, and agree the supported production functions and documented limits in the proposal.

Manufacturing ERP implementation and user testing

Your product, cost policy
and acceptance checks.

Agree the demonstrated production scope first. Use your own product and batch records to review data, costing, user responsibilities and the reconciliation before cutover.

  1. Prepare product, material and cost records

    Bring products, material lists, revisions, units, batches, locations, supplier records, opening stock and costing policy. Include one completed production record and its reconciliation.

  2. Demonstrate the required production scope

    Review BOM structure, issues, returns, partial completion, rejects and corrections. Confirm what is standard, configured or integrated before agreeing the first phase.

  3. Test, reconcile and train the users

    Use your own product records for user acceptance testing. Reconcile materials, finished stock, work in progress and finance, then agree training, cutover and support responsibilities.

Questions, answered

Before your
manufacturing ERP demo.

Bring one product and the material, output and costing records behind it. Review the supported functions, limits and evidence together.

Ask about your manufacturing requirements

Which production planning and BOM functions are supported?

The public industry hub describes bills of materials, work orders and batch costing. It does not establish the detailed scope of BOM versions, multi-level structures, scheduling or planning. Bring your product structure to a current demo and confirm the exact functions and limits in writing.

Can production costs reach the ledger?

The public manufacturing description refers to production costing connected to finance. Review a permitted completion record and its resulting postings to confirm the actual method and accounts. Agree material, labour, overhead, work-in-progress and reversal treatment; the example’s cost bridge is not a posted journal.

Are batch and serial records available?

VisionONE Inventory & Warehousing describes batch, serial and expiry tracking. Manufacturing traceability needs its own demonstration of material issues, output batches and outward movements. Confirm whether the required source-to-finished-product links, reports and permissions are supported for your process.

What requires configuration or integration?

Scope product structures, production records, cost allocation, approval rules and reports with the implementation team. Confirm any external shop-floor system or machine data separately. A materials and inventory demo alone does not establish MRP, MES, capacity planning or automated machine integration.

How are material shortages and returns handled?

Review available stock and incoming quantities before issuing materials. Use a shortage, substitute material and return-to-stores case in your demo. Confirm the supported records, approval route and cost effects against the original production reference.

Can labour and overhead form part of batch cost?

The example allocates KES 12,000 labour and KES 5,000 overhead to demonstrate the cost build-up. Your finance team needs to agree the eligible costs and allocation policy, then confirm the supported configuration and postings. No universal cost-absorption rule is assumed.

Does this include advanced MRP or shop-floor control?

Advanced MRP, finite-capacity scheduling, MES, machine telemetry and automated quality control require their own demonstration and written scope. Specify those requirements explicitly; a demo of inventory, BOM or cost records does not establish their availability.

What should we bring to a manufacturing demo?

Bring one product and material list, a production record, source stock references and the costing report you use today. Include a shortage, partial completion or correction. Ask to trace the accepted output to stock and finance and to review the documented production limits.

See it with your records

Bring one product.
Follow the materials, output and cost.

Review your material list, production record, completed stock and finance requirements in a scoped demo. Include one exception so the supported limits are clear.

Book a free manufacturing demoChat on WhatsApp

A focused discussion around your manufacturing requirements, with no obligation.